Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

Product Details
Customization: Available
After-sales Service: Online Service
Size: 50cubic Meters
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (22)
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
  • Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Find Similar Products
  • Overview
  • Product Parameters
  • Each model
  • FAQ
Overview

Basic Info.

Model NO.
50 cubic meters
Type
Container Portable Fuel Station
Medium
Diesel
Feature
Energy Saving and Environmental Protection
Frame Shape
Rectangular
Material
Carbon Steel
Dimension(L*W*H)
Customized
Volume
5000L-100000L
Specification
50 cubic meters
Trademark
Shandong Longtai
Origin
Shandong Longtai
HS Code
8479899990
Production Capacity
5000 Pieces/Year

Product Description

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling DeviceApplied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling DeviceApplied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling DeviceApplied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

Product Parameters

Skid-Mounted Mobile Filling Station of 50 CBM

 
NO. Parts Specifications & Models
Barrier explosion-proof tank and safety accessories
1
LT double-walled explosion-proof storage tank LT - Double Layer Explosion-proof Steel Tank. The effective volume of the inner tank is 50 m³; The tank can withstand 2 hours of fire resistance test, it suit for atmospheric pressure hazardous chemical packaging container. The inner tank is plugged in process and the double-layer weld is strengthened. Its weld strength is higher than that of the butt weld of 12mm thick steel plate. Tank wall thickness is no less than 8MM.

2
Barrier explosion-proof material construction The inner tank and the interlayer of the inner and outer tank are filled with barrier explosion-proof materials. After two quenching treatments, the service life is improved 70% longer than market similar barrier explosion-proof materials. The manufacturing standard of barrier explosion-proof materials is higher than the requirements of the national standard, and the test report issued by a testing institution with national first-class explosion-proof appraisal qualification.
3 Device base LT-JC-50/2-02
4 Explosion-proof power distribution system The default is 380V three-phase.
5 Explosion-proof sound and light alarm device Explosion-proof sound and light alarm lamp: flashing frequency 150min; Sound intensity90(dB) ; Protection class IP65.
6 Safety lighting system Safety lighting: explosion-proof ceiling lamp, integrated design, beautiful and energy-saving.
7 Oil and gas alarm device It is installed in the refueling operation site or unloading pump valve room,which has concentration display and sound and light alarm functions and adopts imported catalytic combustion sensor with micro controller technology. 
8 Emergency shut-off device (automatic shut-off of protection valve) In the event of earthquakes, accidental overturning, falling, impact and other non-manpower controllable disasters, the tank will be automatically sealed to ensure that the oil does not leak. The internal mechanical transmission components of the unit ensure that it can work effectively even when the power supply is lost. The device is normally open, and in the event of a fire, its fuse is heated and melted and the valve is closed.
9 Automatic fire extinguishing device Ultra-fine dry powder fire extinguishing agent is filled with an appropriate amount of driving gas nitrogen, which technical performance in line with the requirements of XF602-2013 standard. The operating temperature is 68-93 degrees Celsius.
10 Explosion-proof flame retardant breathing valve device The working positive pressure of the breathing valve is 2kPa~3kPa. The working negative pressure is 1.5kPa~2kPa. The installation height is greater than 4.5m, and the nominal pressure is 1.0MPa.
11 Emergency pressure relief device When the internal pressure is too large, the emergency pressure relief device will burst open, which plays a role in rapidly reducing the pressure to prevent the tank from exploding due to pressure and avoid more serious accidents. One set of bins, opening pressure: 27±2KPa.
12 Anti-overflow device If the oil level in the tank exceeds the warning height (up to 95% of the tank capacity), the tank will automatically lock to prevent oil from overflowing.
13 Tank internals device LT-QZ-50/2-16
14 Lightning protection grounding, electrostatic grounding system It includes electrostatic grounding alarm, anti-lightning surge protector, aluminum alloy electrostatic clamp connected to the dump truck and a grounding copper braided wire.
The skid-mounted station is connected to the grounding electrode at the site of use (the user ensures that the resistance of the grounding electrode <4Ω).
15 Leak-proof detection mirrors It can be detected when a leak occurs between the inner and outer tanks .
16 It can be detected when a leak occurs between the inner and outer tanks . LT-FBTY-32
17 Leak detection and monitoring device/
Alarm device
Installed at the bottom between the two layers of tank walls, it has electronic display table display, which could online monitoring at any time and the online monitoring device and alarm facilities with alarm function.
18 Leak-proof device Anti-static aluminium device has the accept oil spillage during unloading.
19 Safety guards It has escalators and safety guardrails.
20 Tank cleaning channel It has reserved cleaning channels.Under the premise of ensuring the overall explosion-proof performance, the overall cleaning time could be shortened by half compared with the traditional barrier explosion-proof skid-mounted gas station.
21  Heating and insulation device This install a heating system and a whole skid tank, pipeline, and fuel dispenser insulation device,which ensure the normal storage and filling No.0 diesel in the severe cold winter.
 
liquidometer 1 Electronic liquidometer Magnetostrictive electronic level gauge. Includes 2 probes, with a piece of touchable LCD screen; The measuring range is 0.15~2.7m, and the measurement error is ±0.2mm. Visualization interface for tank media simulation with temperature monitoring function.
2 Liquid level alarm device The alarm value of the storage tank capacity ≥  90% of the tank storage capacity.
3 Manual metering device It is used to regularly calibrate the accuracy of the electronic level gauge. At the same time, the volume of oil in the tank could be detected in the event of the failure or power failure of the electronic level meter.
 
Filling system 1 Unloading pumps It include explosion-proof vertical explosion-proof oil unloading pump, which flow rate attend 45m3/h and designs one bin with one unit. The motor is flameproof (dII.) and ingress protection is IP55.
2 Discharge pump piping system The unloading port is a national common size, which could be docked by tank trucks. The quick coupling adopts DN65 self-sealing ball valve, pipe diameter DN65. The height of the outlet pipe nozzle from the bottom of the tank is 0.15m.
3 Unloading oil and gas recovery system It is equipped with a first-class oil and gas recovery device, which is connected to the tanker to implement closed unloading, which hold the oil and gas not leak out.
4 Discharge filter Stainless steel, 80 mesh. The filter device can be disassembled as a whole, and the internal filter screen holder can be reused, and only the stainless steel filter on it needs to be replaced, which is convenient and fast, and the maintenance cost is low.
5 Filling machine It has double-pump double-gun refueling machine, self-priming pump, flowmeter, LCD screen, 380V motor, refueling hose. The whole machine has explosion-proof and pull-off protection, the emergency stop button of mechine has electrostatic release function.
6 Intelligent background management system Connect with your company's management system to achieve unified management and issue real-time data reports.
 
Exterior decoration 1 Roller shutter doors Aluminium alloy
2 Skid shell It uses the latest sheet metal technology, the external welds are more beautiful and stronger and reduced by 60% than the traditional skid-mounted station. The skid-mounted station is designed to be waterproof, which saves costs and is easy to move.
3 Anti-corrosion and paint It use 4 layers of anti-corrosion spraying paint add electrostatic spraying. The paint is made of  high temperature and moisture resistance imported quality paint that improved service life. The standard color of the appearance is white, and the spraying pattern can be customized according to customer requirements.
 
Monitoring System
 
1 video monitoring system
 
 Explosion-proof camera 2 lines, Network cable Data cable, Labor costs such as installation of accessories,  Commissioning fee (up to 100 meters)
 

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

 

Each model

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

                                        3 cubic meters                                                                                       20 cubic meters

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device
Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

                          10 cubic meters                                           30 cubic meters                                             40 cubic meters

Applied to Logistics Park Separate and Explosion-Proof Skid-Mounted Filling Device

FAQ


1. Q: Are you a trade company or manufacturer?Where is your company located?
     A: We are a professional manufacturer with our own factory.Our company is located in ShanDong, China.√
2. Q: What are your products?
    A: Portable fuel station, Containerized fuel station, Oil storage tanks, Underground storage tanks, Oil containers.
3. Q: What is the delivery time of your products?
    A: The delivery time of oil storage tank is usually within 30 days, and fuel station is within 50 days. Please contact for details.
4. Q: How about the warranty rules?
   A: Our warranty is one year after shipment. Within one year, we will send broken spare parts at our expense upon request if it is proved to be our production defect. In fact, we rarely receive any spare parts request. If the tanks are maintained properly, they can be used for 15-20 years.
5. Q: What documents do you offer?
   A: We offer product quality certification issued by the manufacture, tank drawing, GA drawing, operation instructions and calculation sheet etc for each tank.
6.Q: Can I visit your company?
   A:Welcome to visit our factory and it is our great pleasure.√
7.Q:How can I get more details of the deal ?

   A: Please write down all your questions. And click send, we will reply you by mail in 24 hours.√

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier